Agnico-Eagle Reports 1999 Year End and Fourth Quarter Results and Announces a 100% Increase in Gold Reserves

02/25/2000


Stock Symbols: AGE (TSE, ME)

AEM (NYSE)

TORONTO, Feb. 25 /CNW/ - Agnico-Eagle Mines Limited today reported a 1999 net loss of US$14.7 million, or US$0.28 per share compared to a net loss of US$7.5 million, or US$0.15 per share in 1998. Operating cash flow before changes in non-cash working capital items declined to a deficit of US$10.6 million, or US$0.20 per share, compared to cash flow of US$1.3 million, or US$0.03 per share in 1998.

"The worst gold price environment in decades and lower gold grades in the soon-to-be depleted Shafts No. 1 and No. 2 mining areas at our LaRonde Mine contributed to Agnico-Eagle's disappointing operating results in 1999", said Sean Boyd, President and Chief Executive Officer. "However, gold production is ahead of budget in the first two months of 2000 and the expansion program at LaRonde is on schedule to begin mining the new mineralized zones at an increased production rate through Shaft No. 3 in the second half of 2000. Furthermore with the substantial increase in ore reserves and resources reported today, the LaRonde deposit is currently the largest gold deposit in Canada with a combined gold reserve and resource of 6.1 million contained ounces", added Mr. Boyd.

Agnico-Eagle reported a net loss of US$5.0 million, or US$0.09 per share for the quarter ended December 31, 1999 compared to a net loss of US$0.9 million, or US$0.01 per share in the same period last year. Operating cash flow decreased to a deficit of US$3.5 million, or US$0.07 per share in the fourth quarter compared to cash flow of US$0.7 million, or US$0.01 per share in the 1998 fourth quarter.

OPERATING RESULTS

The increased loss in 1999 from that reported in 1998 was due to a seven percent decrease in the gold price realized (US$274 per ounce versus US$296 per ounce) and a decrease in production, only partly offset by lower production costs at the LaRonde mine.

Onsite operating costs improved by 15 percent in 1999 to C$56 per ton of ore milled compared to C$66 per ton in 1998. However, cash operating costs to produce an ounce of gold increased to US$277 per ounce from US$212 per ounce as gold production decreased to 90,035 ounces from 150,443 ounces. The decline in gold production is due to lower gold grades as mining activities deplete the remaining ore reserves from Shaft No. 1 and Shaft No. 2. Similarly, in the fourth quarter of 1999, onsite operating costs improved by 23 percent to C$53 per ton of ore milled compared to C$69 per ton in the fourth quarter of 1998.

STRONG FINANCIAL POSITION

Consolidated cash and cash equivalents were US$22.6 million at December 31, 1999 compared to US$76.3 million at the end of 1998. In 1999, US$15 million was drawn under the Company's long-term bank facility. Cash used for capital expansion and acquisitions in 1999 was US$68.9 million. Including the undrawn portion of its long-term bank facility, Agnico-Eagle currently has over US$100 million of liquidity.

In the years 2000 and 2001, approximately US$56.1 million and US$21.0 million will be spent, respectively, to complete the expansion of the LaRonde mine to 5,000 tons per day from 2,000 tons per day, as well as on sustaining capital. Cash flows from the newly expanded mine are expected to be sufficient to fund the expansion in the medium term. However, since much of the capital for construction will be expended in the immediate short-term, additional liquidity will be provided by the bank facility to meet working capital requirements. The Company expects to draw an additional US$40 to US$50 million in 2000 under its bank facility to complete construction at LaRonde.

Agnico-Eagle's gold production is budgeted to increase in 2000 to 174,000 ounces at a cash cost of US$168 per ounce. The increase in budgeted production is attributable to the completion of shaft sinking at LaRonde's Shaft No. 3 and the planned changeover to production in this shaft by the end of June, 2000. As a result, much of the production forecast for 2000 will occur in the second half of the year. Production in the first half of 2000 will continue to be characterized by lower grade ore from the nearly depleted ore zones at Shaft No. 1 and Shaft No. 2. However, the LaRonde mill is expected to operate at an average annual rate of 3,900 tons per day in 2000, with a rate of up to 5,000 tons per day by the end of the year when the mill expansion is completed. The full benefits of the expansion to 5,000 tons per day are not expected to be realized until 2001 when much of the initial development of the lower gold-rich portion of Zone 20 North is completed. Gold production is expected to reach 221,000 ounces in 2001 at a cash cost of US$133 per ounce and is expected to exceed 300,000 ounces per annum in 2002 at a cash cost of US$115 per ounce.

ORE RESERVES AND RESOURCES

Since the last ore reserve and resource update in June 1999, Agnico-Eagle's gold ore reserves have doubled to 3.0 million ounces and the total gold ore reserve and resource has increased 22 percent to 6.1 million ounces. The gold price used for the ore reserve and resource calculation was unchanged from 1998 at US$300 per gold ounce. The by-product metal prices used were US$5.00 per silver ounce, US$0.80 per copper pound and US$0.50 per zinc pound. Ore reserves are diluted while the resource remains undiluted.

On a year over year basis, the total ore reserve and resource tonnage (including all three shafts) increased 31 percent from 39.7 million tons to 52.1 million tons. Proven and probable reserves increased 173 percent from 1.1 million ounces and the total gold ore reserve and resource increased 36 percent from 4.5 million ounces.

    <<

            2000 Shaft No. 3 Ore Reserve and Resource Summary
    -------------------------------------------------------------------------
    Category  Zone    Au(oz/t) Ag(oz/t) Cu(%)  Zn(%)    Au(oz)      Tons
                                                     (thousands) (thousands)
    -------------------------------------------------------------------------
    Probable  20N(Au)   0.15    2.30    0.71    1.71     1,468       9,643
    -------------------------------------------------------------------------
    Probable  20N(Zn)   0.03    2.71    0.10    7.48       448      16,440
    -------------------------------------------------------------------------
    Probable  20S(El
              Coco)     0.30    2.08    0.33    3.99       369       1,235
    -------------------------------------------------------------------------
    Probable  20S       0.19    1.01    0.35    1.61       422       2,275
    -------------------------------------------------------------------------
    Probable  6         0.11    1.60    0.19    4.02         7          65
    -------------------------------------------------------------------------
    Probable  7         0.19    1.08    0.39    1.77       187       1,004
    -------------------------------------------------------------------------
    -------------------------------------------------------------------------
    Subtotal            0.10    2.37    0.33    4.90     2,901      30,661
    -------------------------------------------------------------------------
    -------------------------------------------------------------------------
    Resource  20N(Au)   0.17    0.67    0.75    0.06     2,711      15,750
    -------------------------------------------------------------------------
    Resource  20N(Zn)   0.01    1.24    0.04    9.32        33       2,337
    -------------------------------------------------------------------------
    Resource  20S(El
              Coco)     0.28    0.86    0.13    2.64        11          39
    -------------------------------------------------------------------------
    Resource  20S       0.12    0.42    0.07    1.09        74         627
    -------------------------------------------------------------------------
    Resource  6         0.12    1.15    0.26    1.94       127       1,040
    -------------------------------------------------------------------------
    Resource  7         0.12    1.68    0.49    1.61        95         798
    -------------------------------------------------------------------------
    -------------------------------------------------------------------------
    Subtotal            0.15    0.79    0.61    1.30     3,051      20,591
    -------------------------------------------------------------------------
    -------------------------------------------------------------------------
    Total               0.12    1.74    0.45    3.45     5,952      51,252
    -------------------------------------------------------------------------



     2000 Total Ore Reserve and Resource - Shafts No. 1, No. 2, No. 3 Summary

    -------------------------------------------------------------------------
    Category    Zone   Au(oz/t) Ag(oz/t) Cu(%)  Zn(%)    Au(oz)      Tons
                                                     (thousands) (thousands)
    -------------------------------------------------------------------------
    Total P&P   No. 1,
                No. 2,
                No. 3    0.10    2.33   0.33    4.78     3,016      31,546
    -------------------------------------------------------------------------
    -------------------------------------------------------------------------
    Grand Total No. 1,
                No. 2,
                No. 3    0.12    1.72   0.44    3.41     6,067      52,137
    -------------------------------------------------------------------------
    >>

This is the seventh consecutive year that the total ore reserve and resource position has increased at the LaRonde Property. The current proven and probable ore reserve position of 3.0 million contained gold ounces is the highest in the property's 13-year operating history. The transfer of resource to ore reserves in 1999 was made possible by improved underground drill access provided by Shaft No. 3.

Zone 20 North continued to grow into a large gold-copper massive sulfide orebody. On a year over year basis, overall tonnage increased 40 percent from 31.6 million tons to 44.2 million tons. Total Zone 20 North contained ore reserve and resource gold ounces increased 62 percent from 2.9 million ounces to the current position of 4.7 million ounces. The gold resource calculation did not incorporate all the deep drill results but did include values returned from drill hole 3194-08 which intersected 0.18 ounces of gold, and 0.95% copper over a true thickness of 75.5 feet at a depth of 8,900 feet below surface. The gold resource calculation did not include the values obtained in drill hole 3170-11B which intersected 0.19 ounces of gold over a true thickness of 51.8 feet at a depth of 9,727 feet below surface. Zone 20 North remains open in all directions below Shaft No. 3's depth of 7,350 feet.

The 1999 drilling program also transferred the upper gold resource of 321,901 ounces located on the El Coco Property into ore reserves. The current El Coco ore reserve position stands at 368,493 ounces. The year over year comparison of resource to ore reserve has been tabulated below:


    <<
                      El Coco Reserve - Resource Comparison

    -------------------------------------------------------------------------
    Year   Category   Au(oz/t) Ag(oz/t)   Cu(%)    Zn(%)   Au(oz)    Tons
                                                       (thousands)(thousands)
    -------------------------------------------------------------------------
    1999   Resource     0.37     1.88     0.44     2.81      322      869
    -------------------------------------------------------------------------
    2000   Probable
            Reserve     0.30     2.08     0.33     3.99      369    1,234
    -------------------------------------------------------------------------
    >>

DRILLING AND EXPLORATION

Since the last drilling update in December 1999, five drills have been in operation on definition and exploration drilling. Three drills have been working from Shaft No. 3 drill stations on Levels 194, 206, and 215. The drills are completing the level infill drilling of Zones 7, 20 South and 20 North. Upon completion of this phase of drilling, the deep drilling program will be resumed to test Zones 20 North and 20 South between depths of 7,400 feet and 8,800 feet below surface. This phase of drilling will be started by the end of March.

Two additional drills have been working in the upper part of the mine between Levels 118 and 149 focusing on Zone 20 North and the eastern extension of Zone 20 South - El Coco.

Zone 20 North - Definition Drilling

Since the last definition drilling update on Zone 20 North, two drill holes have been completed on Level 215 (7,054 feet below surface) as well as additional delineation drill holes in the upper part of the mine. The results have been tabulated below:

     <<
    -------------------------------------------------------------------------
                True          Gold(oz/ton)  Silver
    Drill Hole  Thickness(ft) Cut(1.5 oz/t) (oz/ton)   Copper(%)     Zinc(%)
    -------------------------------------------------------------------------
    11820661Au    15.4         0.20         1.95         0.83         0.38
    -------------------------------------------------------------------------
            Zn    24.6         0.06         5.75         0.03         7.18
    -------------------------------------------------------------------------
    12220641Au    15.1         0.12         0.66         0.38         0.35
    -------------------------------------------------------------------------
            Zn    22.0         0.09         2.44         0.04         8.68
    -------------------------------------------------------------------------
    14920631Au    19.0         0.12         1.66         0.25         0.49
    -------------------------------------------------------------------------
            Zn    50.9         0.03         2.29         0.13         9.28
    -------------------------------------------------------------------------
    14920674Au    18.0         0.08         0.89         0.31         0.21
    -------------------------------------------------------------------------
            Zn    76.8         0.04         1.56         0.07         7.11
    -------------------------------------------------------------------------
    3215-01 Au* 62.3         0.15         1.18         0.81         0.14
    -------------------------------------------------------------------------
    3215-02 Au* 26.2         0.12         1.45         0.22         0.11
    -------------------------------------------------------------------------
            Zn    31.2         0.04         2.03         0.07         5.63
    -------------------------------------------------------------------------
    *Preliminary
      >>

The Level 215 drilling continued to confirm mineralized true thicknesses in the range of 50 to 60 feet. Further drilling to the west on Level 215 is restricted by access and will await the start of the Level 215 exploration drift to the west of Shaft No. 3, scheduled to start in the third quarter of this year. Based on all of the drilling information obtained to date the area with the best potential to increase the size of Zone 20 North lies to the west.

The drilling continued to confirm the trend to gold-copper mineralization at depth. The type of gold-copper mineralization encountered along Levels 194, 206, and 215 closely resembles the results previously obtained from the two deep exploration drill holes. The footwall zone encountered on all three shaft levels and in the deep drilling is characterized by a garnet bearing andesite. This relationship and increasing gold/copper ratios are consistent at depth. The major transition from zinc-silver mineraliation to gold-copper mineralization occurred at the Level 194 horizon. The large (50 feet and greater) gold-copper intersections were not noted in the upper levels of Zone 20 North. The observed mineralogy of both the deep and shaft level drilling is similar to that of Shaft No. 1's Main Zone. The greatest thicknesses of economic mineralization have been encountered towards the west. The potential for further expansion is excellent as Zone 20 North is open at its point of greatest overall thickness and it has not been drilled in this area. The western extension of Zone 20 North will be tested from the Level 215 exploration drift.

Zone 20 South and Zone 7 - Definition Drilling

To finalize the Zone 20 South-El Coco production stoping outlines, additional definition drilling was completed on Levels 118 to 125. The results have been summarized below:

    <<
    -------------------------------------------------------------------------
                True          Gold(oz/ton)  Silver
    Drill Hole  Thickness(ft) Cut(1.5 oz/t) (oz/ton)   Copper(%)     Zinc(%)
    -------------------------------------------------------------------------
    11821714      28.2         0.27         1.93         0.38         2.76
    -------------------------------------------------------------------------
    12221763      23.9         0.39         1.56         0.70         2.61
    -------------------------------------------------------------------------
    12521742      21.6         0.30         0.99         0.60         0.72
    -------------------------------------------------------------------------
    3122-34       29.5         0.54         3.26         0.38         6.96
    -------------------------------------------------------------------------
    3122-38       25.3         0.23         1.69         0.19         3.18
    -------------------------------------------------------------------------
    3122-38        9.5         0.45         4.22         0.16         8.83
    -------------------------------------------------------------------------
    >>

Level 215 drilling intersected Zone 7, however the results were disappointing returning lower gold values resulting in a decrease in previous resource estimates. With the western plunge and the greater potential to increase the reserve and resource tonnage contained in Zones 20 North and South, most of the exploration drilling has now been focused on these zones.

Property Acquisition & Regional Exploration Update

This week, Agnico-Eagle acquired a 50 percent interest in Barrick Gold's "Bruce Property" which is located immediately to the east of Laronde's Sphinx Property. The Bruce Property consists of 43 claims covering a total area of three square miles. Under the terms of the acquisition agreement, Agnico-Eagle has committed to spend C$600,000 (US$400,000) over three years in exploration on the property. The property covers the favourable stratigraphy that hosts all of the operating mines along the Cadillac-Bousquet Belt. With this latest property acquisition, Agnico-Eagle now controls the entire eastern portion of this favourable geological belt covering a distance of approximately 12 miles.

Agnico-Eagle currently has one surface drill in operation on its Sphinx Property. The drill is testing zinc mineralization and alteration previously encountered by surface drilling completed at a depth of 1,500 feet late last year. Historically, the occurrence of zinc mineralization on the LaRonde Property has been a favourable indicator for locating economic mineralization.

LARONDE EXPANSION PROGRAM

The year 2000 will be a major turning point for the LaRonde Mine and for Agnico-Eagle as the expansion program achieves several significant milestones. Currently the mine ranks as one of the largest underground development projects in North America. This year will be characterized by three phases 1) Shaft No. 3 changeover , 2) hoist upgrade and 3) mill capacity increased to 5000 tons per day. All these phases are on schedule to meet their expected completion dates.

Shaft No. 3 has reached a depth of 7,300 feet and will be completed during the first week of March. The No. 1 loading station on Level 152 has been completed and the conveyor and crushing system is expected to be completed by the end of April. Structural steel for the Level 220 loading station (7,221 feet below surface) is currently being installed. Final preparations are underway for the changeover phase scheduled to start upon completion of shaft sinking.

Foundations for the new headframe backlegs have been completed. The contract for headframe modifications has been awarded. Steel fabrication is in progress and modifications to the headframe are scheduled to start at the end of March.

Foundations for the new hoist motor are being poured. The hoist is in the final stages of the manufacturing process. Delivery is scheduled for the end of April with installation expected to be complete by the middle of June. Hoisting at 3,600 tons per day from the underground operations will be started in July and ramped up to 5,000 tons per day by the beginning of the fourth quarter 2000.

Development performance continues to be excellent with ramp access in the upper part of the mine now entirely complete. Currently ramp access is available from Level 110 down to Level 150. Mining blocks are being prepared on Levels 122, 125, and 149 for Zone 20 North and on Levels 118 to 125 for Zone 20 South. Ground conditions have been excellent. Dilution on the eight mining blocks extracted to date has averaged approximately 11 percent.

The mill reached the 3,600 ton per day rate at the beginning of January. Peak rates of 3,900 tons per day have been reached. Tests conducted on the SAG mill confirmed its ability to process at a rate of 5,000 tons per day. The mill is currently processing a 40,000-ton composite bulk sample from Zones 20 South and North. Zinc recoveries have varied between 63% to 84% and are currently averaging 78%. Gold recoveries have ranged between 88% and 95% and are currently averaging 92%. Both zinc and gold grades are as projected.

The paste backfill plant has been completed and is in the commissioning phase. Work on the precious metals recovery circuit is progressing well. Foundations have been completed and building and tank erection is in progress. Engineering work is nearing completion on upgrading both the zinc and copper flotation circuits. Construction is scheduled to start in May.

This press release contains certain "forward-looking statements" (within the meaning of the United States Private Securities Litigation Reform Act of 1995) that involve a number of risks and uncertainties. There can be no assurance that such statements will prove to be accurate; actual results and future events could differ materially from those anticipated in such statements. Other risks and uncertainties are disclosed under the heading "Risk Factors" in the Company's Annual Information Form (AIF) filed with certain Canadian securities regulators (including the Ontario and Quebec Securities Commissions) and with the United States Securities and Exchange Commission (as Form 20-F).

Agnico-Eagle Mines Limited is an established Canadian gold producer with operations located principally in northwestern Quebec and exploration and development activities in Quebec, Ontario and Nevada. Agnico's operating history includes 25 years of continuous gold production primarily from underground mining operations. Current proven and probable gold reserves stand at 3.0 million contained ounces, with an additional 3.1 million ounces in the mineral resource category at its LaRonde Mine. Agnico-Eagle is currently focused on the expansion and large scale exploration program of its LaRonde Mine which is expected to result in increased gold production and expanded gold reserves.

    <<

    Summarized Quarterly Data                     Agnico-Eagle Mines Limited

    -------------------------------------------------------------------------
    (thousands of United States     Three months ended            Year ended
    dollars, except per share and         December 31,          December 31,
    per ounce amounts) (Note 1)        1999       1998       1999       1998
    -------------------------------------------------------------------------

    Consolidated Financial Data

    Income and cash flow
    Revenues from mining
     operations (Note 2)          $   6,732  $  11,197  $  29,605  $  43,202
    Net loss for period           $  (4,977) $    (853) $  (14,675)$  (7,475)
    Loss per share                $   (0.09) $   (0.01) $   (0.28) $   (0.15)
    Operating cash flow (Note 3)  $  (3,505) $     724  $ (10,605) $   1,261
    Operating cash flow per
     share                        $   (0.07) $    0.01  $   (0.20) $    0.03
    Gold production - ounces         16,211     37,056     90,035    150,443
    Average gold price -
     per ounce realized           $     292  $     294  $     274  $     296
    Average exchange rate -
     US$ per Canadian dollar         0.6792     0.6482     0.6725     0.6751
    Weighted average number
     of shares - basic
     (in thousands)                  53,462     53,182     53,331     50,005

    Operating and Financial
     Summary
    LaRonde Division
    Revenues from mining
     operations (Note 2)          $   6,732  $  11,197  $  29,605  $  43,202
    Mine operating costs              8,214      8,487     30,110     33,255
    -------------------------------------------------------------------------
    Mine operating profit (loss)  $  (1,482) $   2,710  $    (505) $   9,947
    -------------------------------------------------------------------------

    Tons of ore milled              227,826    188,681    798,396    776,752
    Grade - ounces of gold per
     ton                               0.09       0.21       0.13       0.21
    Gold production - ounces         16,211     37,056     90,035    150,443
    Silver production - ounces       82,661     62,184    277,327    269,985
    Zinc production - pounds      5,127,658  1,041,394  9,778,278  1,231,446
    Copper production - pounds      475,661  1,526,855  3,282,471  6,151,063

    Onsite operating costs per ton
     milled (Canadian dollars)    $      53  $      69  $      56  $      66
    -------------------------------------------------------------------------
    -------------------------------------------------------------------------

    Operating costs per gold
     ounce produced (US$):
    Onsite operating costs
     (including reclamation
     provision)                   $     503  $     227  $     334  $     229
    Less: Non-cash reclamation
           provision                     (3)        (3)        (4)        (3)
          Net byproduct revenues       (135)       (20)       (53)       (14)
    -------------------------------------------------------------------------
    Cash operating costs          $     365  $     204  $     277  $     212
    Non-cash costs:
    Reclamation provision                 3          3          4          3
    Depreciation and amortization        74         41         61         42
    -------------------------------------------------------------------------
    Total operating costs         $     442  $     248  $     342  $     257
    -------------------------------------------------------------------------
    -------------------------------------------------------------------------

    Notes to Summarized Quarterly and Consolidated Financial Data:

    (1) Effective January 1, 1999, Agnico-Eagle changed its functional and
        reporting currency from Canadian to United States dollars. The
        temporal method is applied for the accounting currency transactions
        and translation. Comparative figures for periods prior to January 1,
        1999, denominated into Canadian dollars, are translated into United
        States dollars, under generally accepted Canadian accounting
        principles, using the closing spot Canadian and United States
        currency exchange rate as at December 31, 1998 of $1.5333.

    (2) Revenues from mining operations consists of gold and byproduct
        revenues net of smelting, refining and transportation charges.

    (3) Before non-cash working capital adjustments.



    Consolidated Balance Sheets                  Agnico-Eagle Mines Limited
    As at December 31,
    -------------------------------------------------------------------------
    (thousands of United States dollars)
                                                        1999           1998
    -------------------------------------------------------------------------

    ASSETS
    Current
    Cash and cash equivalents                    $    22,588    $    76,262
    Metals awaiting settlement and gold bullion        5,857         23,210
    Income and mining taxes recoverable                2,353            714
    Inventories:
      In-process                                       2,390              -
      Supplies                                         3,739          3,089
    Prepaid expenses and other                         3,857          3,469

    -------------------------------------------------------------------------
    Total current assets                              40,784        106,744
    -------------------------------------------------------------------------
    Investments, loans, advances and other assets     21,605         13,560
    Future income and mining tax assets               12,022          4,061
    Mining properties                                219,817        156,388
    -------------------------------------------------------------------------
                                                 $   294,228    $   280,753
    -------------------------------------------------------------------------

    LIABILITIES AND SHAREHOLDERS' EQUITY
    Current
    Accounts payable and accrued liabilities     $     9,770    $     6,832
    Dividends payable                                  1,682          1,660
    Income and mining taxes payable                    2,913          2,885
    Current interest due on senior convertible
     notes                                             1,896          1,897

    -------------------------------------------------------------------------
    Total current liabilities                         16,261         13,274
    -------------------------------------------------------------------------
    Long-term debt                                   124,122        105,239
    -------------------------------------------------------------------------
    Reclamation provision and other liabilities        5,061          4,507
    -------------------------------------------------------------------------
    Future income and mining tax liabilities           9,695          9,695
    -------------------------------------------------------------------------
    Minority interest                                  3,291          3,592
    -------------------------------------------------------------------------

    Shareholders' Equity
    Common shares
      Authorized - unlimited
      Issued - 55,391,451 (1998 - 55,112,625)        152,992        151,307
    Other paid-in capital                             14,535         14,535
    Contributed surplus                                4,058          3,886
    Deficit                                          (27,271)       (11,499)
    Company's own shares held by a subsidiary
     company                                          (8,516)       (13,783)
    -------------------------------------------------------------------------
    Total shareholders' equity                       135,798        144,446
    -------------------------------------------------------------------------
                                                 $   294,228    $   280,753
    -------------------------------------------------------------------------



    Consolidated Statements of Loss              Agnico-Eagle Mines Limited

    -------------------------------------------------------------------------
    (thousands of United States       Three months ended       Year ended
     dollars, except per share           December 31,          December 31,
      amounts)                         1999       1998       1999       1998
    -------------------------------------------------------------------------

    REVENUES
    Revenues from mining operations
     (net of smelting, refining
     and transportation charges)  $   6,732  $  11,197  $  29,605  $  43,201
    Interest and sundry income          213      1,086      2,506      3,916

    -------------------------------------------------------------------------
                                      6,945     12,283     32,111     47,117
    COSTS AND EXPENSES
    Production                        8,352      8,853     30,585     34,535
    Exploration                       1,787        757      3,838      2,371
    Depreciation and amortization     1,201      1,523      5,463      6,171
    General and administrative        1,056      1,004      4,044      3,590
    Capital tax                         427        264      1,192      1,197
    Interest                          2,170      2,163      8,637      8,596
    Other                                 4          -        974          -

    -------------------------------------------------------------------------
    Loss before the undernoted       (8,052)    (2,281)   (22,622)    (9,343)

    Foreign currency loss            (1,032)      (278)      (329)    (1,442)

    -------------------------------------------------------------------------
    Loss before income and
     mining tax recoveries           (9,084)    (2,559)   (22,951)   (10,785)
    Income and mining tax recovery    4,107      1,706      8,276      3,310
    -------------------------------------------------------------------------
    Net loss for the period       $  (4,977) $    (853) $ (14,675) $  (7,475)
    -------------------------------------------------------------------------

    Loss per share                $   (0.09) $   (0.01) $   (0.28) $   (0.15)
    -------------------------------------------------------------------------



    Consolidated Statements of Cash Flows          Agnico-Eagle Mines Limited

    -------------------------------------------------------------------------
    (thousands of                     Three months ended        Year ended
    United States dollars)                December 31,          December 31,
                                       1999       1998       1999       1998
    -------------------------------------------------------------------------
    Operating activities
    Net loss for the period       $  (4,977) $    (853) $ (14,675) $  (7,475)
    Add (deduct) items not
     affecting cash from
     operating activities:
    Depreciation and amortization     1,201      1,522      5,463      6,171
    Provision for future income
     and mining recoveries           (3,321)    (1,835)    (7,961)    (3,897)
    Foreign-currency
     translation loss                 2,071        552      2,206      1,634
    Amortization of deferred
     interest and financing costs
     on senior convertible notes      1,074      1,015      4,213      3,909
    Reclamation provision and other     447        323        149        919
    -------------------------------------------------------------------------
                                     (3,505)       724    (10,605)     1,261
    Net premiums paid on metals
     and foreign-currency option
     contracts                       (7,527)         -     (7,527)         -
    Net change in non-cash working
     capital balances related to
     operations:
    Metals awaiting settlement
     and gold bullion                (1,029)    (1,624)    17,353        734
    Inventories                      (1,085)      (450)    (3,040)       169
    Prepaid expenses and other          287        37        (388)      (773)
    Income and mining taxes
     recoverable and payable         (1,343)      187      (1,611)       755
    Accounts payable and accrued
     liabilities                      2,576       931       2,938      1,055
    Current interest due on senior
     convertible notes                1,107     1,108          (1)       128
    -------------------------------------------------------------------------
    Cash flows from (used in)
     operating activities           (10,519)      913      (2,881)     3,329
    -------------------------------------------------------------------------

    Investing activities
    Additions to mining properties  (18,342)  (13,505)    (68,892)   (43,774)
    Net increase in investments
     and other assets                  (175)       96        (109)    (1,034)
    -------------------------------------------------------------------------
    Cash flows used in
     investing activities           (18,517)  (13,409)    (69,001)   (44,808)
    -------------------------------------------------------------------------

    Financing activities
    Dividends                           (53)      (21)     (1,075)      (824)
    Share issued by public
     offering                             -         -           -     65,219
    Shares issued under
     employee plans                     596       151       1,561        602
    Share issue costs                     -        58           -     (2,942)
    Proceeds from long-term debt     15,000         -      15,000          -
    Financing costs                  (2,942)        -      (2,942)         -
    (Purchase) sale of the
     Company's own shares by a
     subsidiary company and other     5,457       116       5,457     (4,621)
    -------------------------------------------------------------------------
    Cash flows from financing
     activities                      18,058       304      18,001     57,434
    -------------------------------------------------------------------------

    Effect of exchange rate changes
     on cash and cash equivalents    (1,285)        -         207          -
    Net increase (decrease) in
     cash and cash equivalents      (12,263)  (12,192)    (53,674)    15,955
    Cash and cash equivalents,
     beginning of period             34,851    88,454      76,262     60,307
    -------------------------------------------------------------------------
    Cash and cash equivalents,
     end of period                $  22,588  $ 76,262   $  22,588  $  76,262
    -------------------------------------------------------------------------
    -------------------------------------------------------------------------
    >>



For further information: Sean Boyd, President and CEO, Agnico-Eagle Mines Limited, (416) 947-1212